Off Site
Gatwick Airport - North Terminal
Value £150,500
Build period 12 weeks Client SPIE
Contents:
Weatherproof enclosure 6.0 x 3.7 x 3.0 metres high 2no.off Hamworthy MTHW boilers model Ansty Flue system through roof
Circulating twin head pumps
Pressurisation unit c/w 300 litre expansion vessel 100mm dia Combined air & dirt separator Chemical dosing pot
MTHW Heating flow & return, & cold water services Thermal insulation & protective cladding
Internal lighting, emergency lighting, & small power BMS Controls & wiring
M&S Store, Rushden Lakes
Value £125,000
Build period 10 weeks
Client Oasis Mechanical Services Ltd
Contents:
Weatherproof enclosure 5.0 x 3.2 x 2.2 metres high 1no.off Hamworthy modular boiler Modumax 250Kw Circulating single & twin head pumps Pressurisation unit c/w expansion vessel
100mm dia Combined air & dirt separator Chemical dosing pot
LTHW Heating, gas, & cold water services Thermal insulation & protective cladding BMS Controls, lighting, & small power
Sainsbury Store, Street, Somerset
Value £120,000
Build period 10 weeks
Client Halsall M&E Ltd
Contents:
Weatherproof enclosure 4.5 x 3.5 x 3.0 metres high 2no.off Floor mounted gas boilers 200Kw each Individual flues through roof
Circulating twin & single head pumps Pressurisation unit c/w expansion vessel
Chemical dosing pot
Hot water calorifier 725 litres c/w unvented system kit
LTHW Heating flow & return, gas, & domestic water services Thermal insulation & protective cladding
Internal lighting, emergency lighting, & small power
BMS Controls & wiring
Thales, Green Park, Reading
Value £385,000
Build period 14 weeks
Client Kier Mechanical & Electrical
Contents:
Weatherproof enclosure 20.0 x 3.5 x 3.0 metres high Built in 4 sections & site re-assembled by CAS team 3no.off Hoval gas boilers 600Kw each
Boiler flues through plantroom roof
Circulating twin & single head pumps
Pressurisation unit c/w expansion vessel
Vacuum de-gassers c/w expansion vessels
2no.off Hot water calorifiers c/w unvented system kits Heating & chilled water combined air & dirt separators Chemical dosing pots
LTHW Heating, chilled water flow & return, & domestic water services
Wellington College, Berkshire
Value £245,000
Build period 12 weeks
Client Wessex Building Services
Contents:
Weatherproof enclosure 8.0 x 4.2 x 3.0 metres high
3no.off Hamworthy modular boilers as Modumax 762Kw each Combined heat & power unit c/w thermal store
Circulating twin & single head pumps
Pressurisation unit c/w expansion vessel
2,000 litres Buffer vessel
Plate heat exchangers
100mm dia Combined air & dirt separator
Chemical dosing pot
Chilled water flow & return, & cold water services
Thermal insulation & protective cladding
Internal lighting, emergency lighting, & small power
BMS Controls & wiring