”Off

”Gatwick

Value £150,500
Build period 12 weeks Client SPIE

Contents:

Weatherproof enclosure 6.0 x 3.7 x 3.0 metres high 2no.off Hamworthy MTHW boilers model Ansty Flue system through roof
Circulating twin head pumps

Pressurisation unit c/w 300 litre expansion vessel 100mm dia Combined air & dirt separator Chemical dosing pot
MTHW Heating flow & return, & cold water services Thermal insulation & protective cladding

Internal lighting, emergency lighting, & small power BMS Controls & wiring

”M&S

Value £125,000
Build period 10 weeks
Client Oasis Mechanical Services Ltd

Contents:

Weatherproof enclosure 5.0 x 3.2 x 2.2 metres high 1no.off Hamworthy modular boiler Modumax 250Kw Circulating single & twin head pumps Pressurisation unit c/w expansion vessel

100mm dia Combined air & dirt separator Chemical dosing pot
LTHW Heating, gas, & cold water services Thermal insulation & protective cladding BMS Controls, lighting, & small power

”Sainsbury

Value £120,000
Build period 10 weeks

Client Halsall M&E Ltd

Contents:

Weatherproof enclosure 4.5 x 3.5 x 3.0 metres high 2no.off Floor mounted gas boilers 200Kw each Individual flues through roof
Circulating twin & single head pumps Pressurisation unit c/w expansion vessel

Chemical dosing pot
Hot water calorifier 725 litres c/w unvented system kit
LTHW Heating flow & return, gas, & domestic water services Thermal insulation & protective cladding
Internal lighting, emergency lighting, & small power
BMS Controls & wiring

”Thales,

Value £385,000
Build period 14 weeks
Client Kier Mechanical & Electrical

Contents:

Weatherproof enclosure 20.0 x 3.5 x 3.0 metres high Built in 4 sections & site re-assembled by CAS team 3no.off Hoval gas boilers 600Kw each
Boiler flues through plantroom roof

Circulating twin & single head pumps
Pressurisation unit c/w expansion vessel
Vacuum de-gassers c/w expansion vessels
2no.off Hot water calorifiers c/w unvented system kits Heating & chilled water combined air & dirt separators Chemical dosing pots

LTHW Heating, chilled water flow & return, & domestic water services

”Wellington

Value £245,000
Build period 12 weeks

Client Wessex Building Services

Contents:

Weatherproof enclosure 8.0 x 4.2 x 3.0 metres high
3no.off Hamworthy modular boilers as Modumax 762Kw each Combined heat & power unit c/w thermal store
Circulating twin & single head pumps
Pressurisation unit c/w expansion vessel
2,000 litres Buffer vessel
Plate heat exchangers
100mm dia Combined air & dirt separator
Chemical dosing pot
Chilled water flow & return, & cold water services
Thermal insulation & protective cladding
Internal lighting, emergency lighting, & small power
BMS Controls & wiring

”On

”Click

”We’re

Unit L, Turnpike Way,
Cressex Business Park, High Wycombe, Buckinghamshire, HP12 3TF


честные казино с быстрыми выплатами
бездепозитные бонусы казино
играть в лучшем казино на деньги
база казино с бездепозитным бонусом

Masturbation addiction and tiredness affect mental and physical well-being, leading to fatigue and reduced energy. Compulsive behavior may impair social function, necessitating intervention. For further insights on managing symptoms, see this site for reliable sources.

онлайн казино России
casino oyunu

01494 469 529

admin@constantair.co.uk

”Contact

[contact-form-7 id=”590″]

”Accreditations”

×

Hello!

Click one of our contacts below to chat on WhatsApp

× How can we help you?